LIBRARY

Every MMP document in one place — platform, two-pagers, SBC series, letters to government, and campaign materials. Click VIEW to read, or DOWNLOAD to save.

Filter:
MMP MEMOS
Policy rationale, evidence, and campaign decisions. A public-facing record of why MMP positions stand where they stand. Memos are categorised by domain and indexed chronologically.
Memo 1 · Coming Soon

FIRST MMP MEMO IN PREPARATION

The MMP memo series will document the reasoning behind campaign positions — defence, energy, banking, family law, electoral reform, and the Sovereign Build Corporation. Companion to the MMC engineering memos and the MMA strategic possibilities series.

In drafting
THE CORE DOCUMENTS 6
The complete blueprint — MMP Federal Platform plus the four-document SBC working set, plus the ATS Patent Family.
01 · PLATFORM
MMP Federal Platform
The complete policy platform. Every number, every commitment, every chapter.
02 · SBC PROSPECTUS
SBC Consortium Prospectus — v23
Stakeholder pitch — the front door. ~11 pages. The Sovereign Build Corporation invitation to founding consortium partners. Six corridors, the Phase 0 Melbourne–Brisbane spine, the financial summary, the Immediate Ask. Patent-family integrated.
03 · SBC MASTER
SBC Master Development Document — v21
The substantive narrative. ~180 pages, 34 chapters across 8 parts. Vision, Common Infrastructure, Phase 0, Continental Programme, Energy and Industry, Continental Outcomes, Delivery, Closing. Includes the Intellectual Property — ATS Patent Family section.
04 · PYLON DESIGN
SBC Multimodal Pylon — Rev19
Engineering specification, ~38 pages. Published as defensive prior art — design freely available for sovereign use. Two designs (B and A), services manifest, build sequence, foundation system, costs. Companion to the patent-protected ATS architectural primitives.
05 · AU ELECTRICITY
AU Electricity Cost MASTER — v16
The economics foundation. ~100 pages, 18 chapters across 9 parts. Technology-by-technology LCOE analysis, MMP energy and transport policy, the SBC Pathway to 6c/kWh delivered. The cost-and-benefits document.
06 · PATENTS
ATS Patent Family — 5/5 Filed
Five Australian Provisional Patents filed at IP Australia, 24–29 April 2026. AU 2026903869, AU 2026903952, AU 2026903992, AU 2026904069, AU 2026904075. Sovereign IP for the SBC architectural primitives.
COMPLETE COMPENDIUM 1
ALL DOCS · 97 PAGES
MMP Complete Policy Compendium
Every two-pager in one document. The complete MMP platform in a single download.
ALL TWO-PAGERS 33
THE PLAN
Mission
THE PLAN
Core Values
THE PLAN
First Term Commitments
THE PLAN
Philosophy
THE PLAN
Resource Extraction Levy
THE PLAN
Electoral Reform
Donation transparency · truth in advertising · federal ICAC · lobbying register · fixed 4-year terms · 10 problems, 10 fixes.
THE PLAN
Royal Commissions
THE PLAN
The People's Portal
THE PLAN
Free Speech & Digital Rights
ECONOMY
Tax Reform
ECONOMY
Cost of Living
ECONOMY
Banking Reform
ECONOMY
Small Business
ECONOMY
State Government Funding
ECONOMY
Tourism & Visitor Economy
SECURITY
Defence — Not Attack
SECURITY
Defence Restructure
SECURITY
Fuel Security
BUILD
SBC — Six Corridors
SBC
SBC Cost & Benefits
Phase 0–3 costs · grants & offsets · net new capital · direct revenue $103–118B/yr · economic uplift 18–25% GDP · social benefits.
Water Security
Alice Hub 30,000GL/yr · buybacks stopped · Murray-Darling restored · Bradfield Scheme finally built · 6.7M new hectares.
BUILD
Farmers 1st
BUILD
New Australian Town
BUILD
Spaceport
BUILD
Housing
BUILD
AI and the Future
CARE
Mental Health & Suicide Prevention
CARE
Health & Medicare
CARE
Health Services
CARE
Education
CARE
Community — Human Welfare
PEOPLE
Protect, Restore, Rewild
PEOPLE
One Billion Trees
PEOPLE
Family Law & Policy
PEOPLE
First Australians
PEOPLE
Gambling Reform
SOVEREIGN BUILD CORPORATION 20
HUB
SBC Overview — The New Deal
The centrepiece. Six corridors, 200 towns, the full vision.
PROSPECTUS
SBC Prospectus v62
Full national vision — 16 chapters, all six corridors, Alice Hub, water, AI, funding model.
NEW
Phase 0 Two-Pager
The east coast spine in two pages. Seven services, zero tunnels, planning now — build 2027+. HSRA comparison table. country journey times.
NEW
Phase 0.1 Two-Pager
Sydney-Newcastle without the tunnel. Remove freight, upgrade CCN to 200km/h. ~60-65min, ~$3-5B, opens ~2028. Zero tunnels. The HSRA comparison.
NEW
Phase 0 Submission v4
88 pages. 27 reasons. HSRA forensic case. Tunnel risk. Melbourne-Brisbane spine. Submitted to government.
SBC
The Pylon v2
Phase 0 and Phase 1 engineering spec. Cap beam, Super-T design, crane method, cost framework.
SBC
Services
SBC
Maglev
SBC
Rail
SBC
Towns
SBC
Farming & Water
SBC
Manufacturing
SBC
AI Compute
SBC
Export
SBC
Costing
SBC
Capital Structure
SBC
Net Zero & Green Industry
OPEN LETTER 1
LETTERS TO GOVERNMENT — FUEL CRISIS 7
LETTER 1 · MINISTER BOWEN
Reserves at 34/36/32 Days — Declare Now
LETTER 2 · 5 MARCH 2026
Invoke the LFE Act & Senate Inquiry
LETTER 3 · 6 MARCH 2026
Global Fuel Emergency — Six Actions Required
LETTER 4 · 7 MARCH 2026
Australia Is In Crisis — Declare Today
LETTER 5 · 9 MARCH 2026
$111 Oil — Declare the Emergency Now
LETTER 6 · 11 MARCH 2026
Ration Now — Tell Australians the Truth
LETTER 7 · 31 MARCH 2026
The Fuel Is In The Silos — Fasttrack Biodiesel
CAMPAIGN MATERIALS 2
VOTE
How to Vote — Robertson — 2027 Federal Election
Voting instructions for the Robertson federal election, 2027 Federal Election.
CAMPAIGN
Volunteer Sign-Up Sheet
Supporter and volunteer sign-up for community events and doorknocking.
SCIENCE & PHYSICS 2
PHYSICS
The Governor Atom Model (GAM)
A deterministic classical-mechanical framework for atomic physics. The atom as a self-regulating centrifugal governor — no quantum probability, no wavefunctions, no strong nuclear force. Version 7.0, April 2026.
PHYSICS
Aether — A Theory of Everything
A classical mechanical model unifying gravity, light, electromagnetism, dark matter, dark energy, matter creation, and cosmic structure. Space is not empty. Version 7.0, April 2026.